Construction
Continued... |
 |
 |
The lift for the
handicapped connecting all three levels is now in place |
|
|
Doors have been
stained and installed in the choir and conference rooms |
 |
|
|
The interior Sanctuary
doors have also been stained and installed |
 |
|
|
 |
Floor tile in the
areas where the pews will go is now in place |
 |
Counter and cabinets
are in process in the sacristy |
|
|
The blower
for the organ has been set in the space beneath the organ platform |
 |
|
|
|
The hanging
lights in the Sanctuary have all been lowered and the organ platform
area has been painted |
 |
 |
And there were
evenings and there were mornings a twenty-seventh week... |
 |