Construction
Continued... |
 |
|
The site was graded and the
Sanctuary filled and leveled in preparation for the floor to
be poured... |
|
|
The rest of the building was
also filled and leveled in preparation for the floor to be poured... |
|
|
|
And by the end of the fourth
week, all was in readiness for the floors and the site graded
in preparation for the new entrance from State Road and the new
parking lot ... |
 |
And there were evenings and
there were mornings a fifth week... |
 |