The mill can be set up and ready to mill in about 20 min.

I use an 1978 International flatbed with a 6,000 # crane :

Here is the truck with a load of Sycamore and Red Elm saved from being ground
up:
January 2006 Tree Removal (600 - 800 bdft saved from being firewood)
